Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
Road cycling routes
Poland
Lubusz Voivodeship
powiat nowosolski
gmina Siedlisko

Stany Railway Bridge – Kolej na Rower Bicycle Path loop from Bielawy

Routes
Road cycling routes
Poland
Lubusz Voivodeship
powiat nowosolski
gmina Siedlisko

Stany Railway Bridge – Kolej na Rower Bicycle Path loop from Bielawy

Moderate

17

riders

Stany Railway Bridge – Kolej na Rower Bicycle Path loop from Bielawy

02:39

63.1km

160m

Road cycling

Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.

Last updated: August 26, 2026

Tips

Includes a segment in which cycling is not permitted

After 8.83 km for 182 m

Waypoints

A

Start point

Bus stop

Get Directions

1

24.4 km

Stany Railway Bridge

Highlight • Bridge

It's nice to ride a bike over the bridge where a train used to run 😀, I recommend taking a ride in the evening because the atmosphere is great and the entire bridge is lit 👍

Translated by Google •

Tip by

2

24.7 km

4

25.0 km

The bridge was built in 1905 by the Beuchelt company from Zielona Góra. At both ends of the bridge, two sets of brick watchtowers - blockhouses in the form of neo-Gothic towers - were placed on pillars. The two-story watchtower buildings, located on both sides of the track, were connected by 12-meter posterns and had their own water intakes (wells). On February 3, 1945, the middle span of the bridge was blown up by retreating German troops. After the war, the bridge was rebuilt in 1955. The above-ground part of the watchtowers on the eastern side of the bridge was demolished.

The bridge operated until the mid-1990s. The railway connection between Wolsztyn and Nowa Sol was broken during the flood in 1997 as a result of water destroying the tracks near the village of Bobrowniki.

For years, efforts have been made to use the bridge for tourist purposes.

At the end of 2019 (expected completion of works) it will serve as a part of a bicycle trail. Cyclists will follow the closed railway line No. 371 Wolsztyn - Żagań,

October 2019 - already put into operation :-)).

Translated by Google •

Tip by

5

25.2 km

Oder River Bridge

Highlight • Bridge

6

25.3 km

The bridge was built in 1905 by the Beuchelt company from Zielona Góra. At both ends of the bridge there were two brick watchtowers on the pillars - block houses in the form of neo-Gothic towers. The two-story watchtower buildings, located on either side of the track, were connected by 12-meter towers and had their own water intakes (wells). On February 3, 1945, the central span of the bridge was blown up by retreating German troops. After the war, the bridge was rebuilt in 1955. The above-ground portion of the watchtowers on the east side of the bridge have been demolished.

Translated by Google •

Tip by

7

25.7 km

Rail Trail Bike Path

Highlight (Segment) • Cycleway

Beautiful new bike path on the railway line.

Translated by Google •

Tip by

8

32.0 km

Kolej na Rower Bicycle Path

Highlight • Cycleway

Very nice railway cycle path, great asphalt.
More info: kolejnarower.pl

Translated by Google •

Tip by

B

63.1 km

End point

Bus stop

Loading

Way Types & Surfaces

Way Types

49.6 km

11.9 km

1.36 km

163 m

Surfaces

55.6 km

5.24 km

2.00 km

163 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Monday 31 August

23°C

14°C

85 %

Additional weather tips

Max wind speed: 26.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Nearby routes

Moderate

5.0

166

Kolej na Rower Bicycle Path – Stany Railway Bridge loop from Lubiatów

02:08h

53.9km

110m

Explore
RoutesRoute plannerFeaturesRedeem a voucherHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy