Westinghouse Memorial – Hot Metal Bridge loop from Mount Oliver
Westinghouse Memorial – Hot Metal Bridge loop from Mount Oliver
4.9
(4725)
11,147
riders
01:46
28.1km
270m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is right next to a parking lot.
Last updated: October 9, 2026
Tips
Temporary access restrictions
Includes segments with temporary access restrictions.
After 8.40 km for 174 m
Open as destination only: • 12:00 AM-5:00 AM (otherwise open)
Waypoints
Start point
Parking
3.96 km
Highlight • Pub
Tip by
10.2 km
Highlight • Monument
Tip by
19.8 km
Highlight • Rest Area
Tip by
23.7 km
Highlight • Bridge
Tip by
28.1 km
End point
Parking
Way Types & Surfaces
Way Types
22.6 km
2.45 km
2.05 km
675 m
302 m
< 100 m
Surfaces
20.1 km
7.61 km
413 m
< 100 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (350 m)
Lowest point (220 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Wednesday 14 October
23°C
13°C
76 %
Additional weather tips
Max wind speed: 15.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.