Leśnica Town Square – Bridge Over the Gliwice Canal loop from Kędzierzyn-Koźle Przystanek
Leśnica Town Square – Bridge Over the Gliwice Canal loop from Kędzierzyn-Koźle Przystanek
5
riders
02:30
40.8km
230m
Gravel riding
Moderate gravel ride. Good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: August 16, 2026
Tips
Includes segments that go up or down a series of steps
You may need to carry your bike.
After 75 m for 7 m
After 6.72 km for 3 m
After 40.7 km for 8 m
Waypoints
Start point
Train Station
4.56 km
Highlight • Cycleway
Translated by Google •
Tip by
19.6 km
Highlight • Settlement
Translated by Google •
Tip by
22.4 km
Highlight • Historical Site
Translated by Google •
Tip by
22.8 km
Highlight • Monument
Translated by Google •
Tip by
24.0 km
Highlight • Viewpoint
Translated by Google •
Tip by
24.4 km
Highlight • Natural Monument
Translated by Google •
Tip by
24.8 km
Highlight • Viewpoint
38.9 km
Highlight • Bridge
40.8 km
End point
Train Station
Way Types & Surfaces
Way Types
17.1 km
10.1 km
6.41 km
4.73 km
2.22 km
279 m
Surfaces
22.0 km
11.6 km
3.39 km
2.71 km
1.09 km
Sign up to see more specific route details
Sign up for freeElevation
Highest point (350 m)
Lowest point (170 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Saturday 31 October
9°C
5°C
-- %
Additional weather tips
Max wind speed: -- km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.