Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Login or Signup

Routes
Bike touring routes & trails
Belgium
Wallonia
Hainaut

Ligne 112A Bridge – Couillet Lock loop from Soleilmont

Routes
Bike touring routes & trails
Belgium
Wallonia
Hainaut

Ligne 112A Bridge – Couillet Lock loop from Soleilmont

Moderate

7

riders

Ligne 112A Bridge – Couillet Lock loop from Soleilmont

03:06

49.7km

320m

Cycling

Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.

Last updated: April 18, 2026

Tips

Includes a segment that goes up or down a series of steps

You may need to carry your bike.

After 49.3 km for 7 m

Waypoints

A

Start point

Train Station

Get Directions

1

1.21 km

Cycling Bridge on RAVeL Line 119

Highlight • Bridge

Line 119, was a Belgian railway line which linked the stations of Luttre and Châtelet from 1880 to 1953. It was used by passenger and freight trains. The last section …

Translated by Google •

Tip by

2

10.8 km

Ligne 112A Bridge

Highlight • Bridge

Line 112A is a Belgian railway line, now de-ironed, which linked Roux to Piéton.
The Hainaut coal basins railway company inaugurated the pedestrian section in Trazegnies on January 1, 1869. …

Translated by Google •

Tip by

26.0 km

Terril du Pétria n°1

Nature Reserve

34.7 km

La Sambre

Lake

5

35.4 km

ArcelorMittal along the Sambre

Highlight (Segment) • Monument

The Cockerill-Sambre group was a Belgian steel producer. The group had sites along the Meuse in Seraing, Cheratte and Herstal and along the Sambre in Charleroi. The company was created …

Translated by Google •

Tip by

6

42.6 km

Couillet Lock

Highlight • Structure

lock of couillet charleroi

Translated by Google •

Tip by

7

43.1 km

Industry from times gone by.

Translated by Google •

Tip by

8

44.5 km

Bridge Over the Sambre

Highlight • Bridge

gorgeous

Translated by Google •

Tip by

9

48.4 km

Gilly-Sart-Allet station is a Belgian railway station (closed and disused) on line 119, from Luttre to Châtelet, located in Gilly, section of the city of Charleroi in the province of …

Translated by Google •

Tip by

10

48.4 km

Gilly-Sart-Allet station is a Belgian railway station (closed and disused) on line 119, from Luttre to Châtelet, located in Gilly, section of the city of Charleroi in the province of …

Translated by Google •

Tip by

B

49.7 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

34.6 km

9.14 km

2.33 km

1.45 km

1.44 km

771 m

< 100 m

Surfaces

31.3 km

14.2 km

2.37 km

1.29 km

511 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Highest point (190 m)

Lowest point (90 m)

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Thursday 28 May

31°C

18°C

15 %

Additional weather tips

Max wind speed: 16.0 km/h

to get more detailed weather forecasts along your route

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Nearby routes

Moderate

4.7

1,354

RAVeL Eau d'Heure Lakes Tour

02:39h

43.3km

280m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy