Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Login or Signup

Routes
Road cycling routes
United States
Massachusetts
Essex County
Haverhill

John Greenleaf Whittier Bridge – Chain Bridge and Deer Island loop from Bradford

Routes
Road cycling routes
United States
Massachusetts
Essex County
Haverhill

John Greenleaf Whittier Bridge – Chain Bridge and Deer Island loop from Bradford

Moderate

4.6

(7648)

14,595

riders

John Greenleaf Whittier Bridge – Chain Bridge and Deer Island loop from Bradford

02:23

55.7km

390m

Road cycling

Moderate road ride. Good fitness required. Mostly well-paved surfaces and easy to ride. The starting point of the route is accessible with public transport.

Last updated: March 27, 2026

Tips

Cycling is not permitted along parts of this route

After 24.6 km for 57 m

After 25.4 km for 57 m

Waypoints

A

Start point

Train Station

Get Directions

1

5.45 km

Bates Bridge Over the Merrimack River

Highlight • Bridge

Bates Bridge spans the Merrimack River, connecting the neighborhood of Groveland. This large bridge links well-connected areas of Haverhill, traversing both urban zones and parks with river views, making it a good route for a smooth ride around the city.

Tip by

2

13.2 km

Rocks Village Bridge

Highlight • Bridge

One of its most famous features is a "swing span" that can actually open up to let tall boats pass through. What's even cooler is that this swing span is …

Tip by

3

20.8 km

Pleasant Valley Road runs alongside the Merrimack River, providing views of the river, its surrounding wetlands, and green spaces. From this vantage point, you can also see Maudslay State Park on the opposite side of the river.

Tip by

4

25.0 km

John Greenleaf Whittier Bridge

Highlight • Bridge

Really nice bike trail built alongside highway lanes (steel barriers and walls between the two).

Tip by

5

25.8 km

Chain Bridge and Deer Island

Highlight • Bridge

Chain Bridge is the first bridge built over the Merrimack River, connecting Deer Island, a small island located in the middle of the river. The bridge has been open to …

Tip by

6

26.2 km

Moseley Woods Park

Highlight • Forest

Very nice park for small family events, playgrounds, sitting on benches next to the river, and walking in the woods.

Tip by

7

33.7 km

Wet Meadows

Highlight • Natural

8

35.0 km

Upper Artichoke Reservoir

Highlight • Lake

Plummer Springs rd has it's bridge closed to cars because it's basically falling in to the river. You can still bike across as of Summer 2022. Turkey hill rd is a favorite with bikers

Tip by

36.0 km

Upper Artichoke Area

Nature Reserve

44.2 km

Heath Woodland Conservation Area

Nature Reserve

B

55.7 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

45.8 km

6.10 km

2.77 km

957 m

147 m

Surfaces

52.6 km

3.16 km

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Thursday 28 May

21°C

12°C

74 %

Additional weather tips

Max wind speed: 17.0 km/h

to get more detailed weather forecasts along your route

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Nearby routes

Easy

4.3

120

East Coast Greenway: New Hampshire

01:51h

48.9km

110m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy