Bullay Double-Deck Bridge – Pünderich Hang Viaduct loop from Neef
Bullay Double-Deck Bridge – Pünderich Hang Viaduct loop from Neef
4.8
(710)
3,810
riders
03:33
56.9km
300m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The route includes a crossing by ferry. The starting point of the route is accessible with public transport.
Last updated: March 23, 2026
This route includes a ferry crossing
Tips
Includes a segment in which cycling is not permitted
After 25.1 km for 54 m
Waypoints
Start point
Train Station
Get Directions
5.14 km
Highlight • Bridge
Translated by Google •
Tip by
6.45 km
Highlight • Cycleway
Translated by Google •
Tip by
37.1 km
Highlight • Bridge
Translated by Google •
Tip by
39.5 km
Highlight • Cycleway
Translated by Google •
Tip by
45.7 km
Highlight • Settlement
Translated by Google •
Tip by
46.1 km
Highlight • Viewpoint
Translated by Google •
Tip by
50.4 km
Highlight • Bridge
Translated by Google •
Tip by
52.0 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
56.9 km
End point
Train Station
Way Types & Surfaces
Way Types
23.4 km
12.4 km
11.4 km
7.73 km
1.29 km
327 m
177 m
131 m
Surfaces
44.2 km
6.53 km
3.49 km
2.28 km
205 m
119 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Monday 18 May
13°C
7°C
29 %
Additional weather tips
Max wind speed: 19.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.