Port Bridge Kołobrzeg – Bridge Over the Drzewny Canal loop from Głowaczewo
Port Bridge Kołobrzeg – Bridge Over the Drzewny Canal loop from Głowaczewo
21
riders
02:34
61.5km
210m
Road cycling
Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is accessible with public transport.
Last updated: May 29, 2026
Tips
The surface along some of this route may not be suitable
Some segments of your route comprise a surface that may not be suitable for your chosen sport.
After 1.83 km for 98 m
After 2.93 km for 84 m
Waypoints
Start point
Train Station
Get Directions
8.00 km
Highlight (Segment) • Trail
Translated by Google •
Tip by
11.4 km
Highlight (Segment) • Cafe
Translated by Google •
Tip by
25.5 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
48.9 km
Highlight • Bridge
Translated by Google •
Tip by
49.3 km
Highlight • Bridge
Translated by Google •
Tip by
49.7 km
Highlight • Rest Area
Translated by Google •
Tip by
61.5 km
End point
Train Station
Way Types & Surfaces
Way Types
35.2 km
20.8 km
3.80 km
1.32 km
252 m
136 m
Surfaces
50.7 km
6.04 km
4.19 km
575 m
< 100 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Saturday 11 July
22°C
17°C
12 %
Additional weather tips
Max wind speed: 19.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free