Routes

Planner

Features

Updates

App

Login or Signup

Get the App

Login or Signup

Routes
Running trails & routes
United States
California
Contra Costa County
Contra Costa Centre

Iron Horse Trail – Iron Horse Trail bridge loop from Pleasant Hill/Contra Costa Centre

Routes
Running trails & routes
United States
California
Contra Costa County
Contra Costa Centre

Iron Horse Trail – Iron Horse Trail bridge loop from Pleasant Hill/Contra Costa Centre

Hard

3.4

(17)

31

runners

Iron Horse Trail – Iron Horse Trail bridge loop from Pleasant Hill/Contra Costa Centre

01:37

15.3km

50m

Running

Hard run. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.

Last updated: June 22, 2026

Waypoints

A

Start point

Train Station

Get Directions

1

77 m

Pleasant Hill/Contra Costa Center BART Station

Highlight • Rest Area

The Pleasant Hill/Contra Costa Center BART Station features the first bike station in Contra Costa County, equipped with 215 bike racks, a retail shop for bicycle accessories, and maintenance services. …

Tip by

2

897 m

Iron Horse Trail junction

Highlight • Cycleway

Crossing of two of the best East Bay flat bike trails, one following a former rail line, the other an old canal that still transports municipal water.

Tip by

3

2.69 km

Iron Horse Trail Overcrossing

Highlight • Bridge

A pedestrian bridge to cross over Ygnacio Valley Road.

Tip by

4

3.37 km

Iron Horse Trail

Highlight (Segment) • Cycleway

The Iron Horse Trail is a 32-mile multi-path that connects the towns of Concord and Pleasanton. It follows the route of the abandoned Southern Pacific Railroad. With its access to …

Tip by

5

4.28 km

Iron Horse Trail

Highlight (Segment) • Cycleway

The Iron Horse Trail is a 32-mile multi-path that connects the towns of Concord and Pleasanton. It follows the route of the abandoned Southern Pacific Railroad. With its access to …

Tip by

6

7.45 km

Iron Horse Trail horses 🐴

Highlight (Segment) • Trail

The old steam trains after which the trail is named are long gone, but some real horses are still in paddocks of the million-dollar houses along the trail. Running on …

Tip by

7

10.8 km

A good end spot to cool off after a loop run along the Iron Horse Trail

Tip by

8

12.6 km

Iron Horse Trail bridge

Highlight • Bridge

The old railway bridge crosses Walnut Creek and continues its service to the bikers and pedestrians along the Iron Horse Regional Trail.

Tip by

B

15.3 km

End point

Train Station

Loading

Way Types & Surfaces

Way Types

13.5 km

1.67 km

163 m

Surfaces

13.4 km

1.65 km

191 m

< 100 m

Sign up to see more specific route details

Sign up for free

Elevation

Elevation

Nothing selected – click and drag below to see the stats for a specific part of the route.

Sign up to see more specific route details

Sign up for free

Weather

Powered by Foreca

Today

Friday 26 June

23°C

13°C

0 %

Additional weather tips

Max wind speed: 26.0 km/h

to get more detailed weather forecasts along your route

Comments

guide_signup

Want to know more?

Sign up for a free komoot account to join the conversation.

Sign up for free

Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.

Save

Edit route

Download GPX

Move start point

Print

Share

Embed on a website

Report an Issue

Report restricted access

Nearby routes

Hard

4.8

93

Lake Chabot Regional Park loop

02:04h

17.3km

310m

Explore
RoutesRoute plannerFeaturesHikesMTB TrailsRoad cycling routesBikepackingSitemap
Download the app
Follow Us on Socials

© komoot GmbH

Privacy Policy