Gold Brook Covered Bridge – Idletyme Brewing & PK Coffee loop from Waterbury-Stowe
Gold Brook Covered Bridge – Idletyme Brewing & PK Coffee loop from Waterbury-Stowe
3.3
(26)
27
riders
03:53
49.4km
710m
Cycling
Hard bike ride. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: August 19, 2026
Waypoints
Start point
Train Station
18.6 km
Highlight • Bridge
Tip by
22.6 km
Highlight • Religious Site
22.8 km
Highlight • Rest Area
Tip by
26.5 km
Highlight • Rest Area
Translated by Google •
Tip by
27.2 km
Highlight • Cafe
Tip by
28.0 km
Highlight • Trail
Tip by
49.4 km
End point
Train Station
Way Types & Surfaces
Way Types
27.5 km
11.7 km
6.19 km
2.80 km
1.08 km
109 m
< 100 m
Surfaces
30.7 km
18.3 km
231 m
163 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (410 m)
Lowest point (130 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Monday 12 October
17°C
7°C
58 %
Additional weather tips
Max wind speed: 17.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.