Back Bay Drive – Balboa Island Ferry loop from Tustin
Back Bay Drive – Balboa Island Ferry loop from Tustin
2.9
(7)
32
riders
02:49
48.5km
190m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The route includes a crossing by ferry. The starting point of the route is accessible with public transport.
Last updated: August 14, 2026
This route includes a ferry crossing
Tips
Includes a ferry crossing
Check ferry timetable.
After 26.2 km for 282 m
Waypoints
Start point
Train Station
Get Directions
7.44 km
Highlight • Lake
Tip by
11.2 km
Highlight (Segment) • Cycleway
Tip by
15.3 km
Highlight • Viewpoint
Tip by
17.8 km
Highlight • Viewpoint
Tip by
26.1 km
Highlight • Structure
Tip by
27.7 km
Highlight • Settlement
Tip by
29.3 km
Newport Bay
Lake
34.9 km
Highlight • Viewpoint
Tip by
36.1 km
Highlight • Viewpoint
Tip by
48.5 km
End point
Train Station
Way Types & Surfaces
Way Types
42.7 km
1.88 km
1.77 km
1.38 km
716 m
< 100 m
< 100 m
< 100 m
Surfaces
29.8 km
18.2 km
535 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Today
Wednesday 19 August
31°C
18°C
0 %
Additional weather tips
Max wind speed: 12.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free