Rising Lane Railway Bridge – Honeysuckle loop from Dorridge
Rising Lane Railway Bridge – Honeysuckle loop from Dorridge
9
riders
01:36
25.7km
180m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: July 18, 2026
Tips
Includes segments that go up or down a series of steps
You may need to carry your bike.
After 94 m for 33 m
After 25.6 km for 33 m
Waypoints
Start point
Train Station
4.10 km
Highlight • Monument
Tip by
4.57 km
Highlight • Structure
5.65 km
Highlight • Monument
5.65 km
Highlight • Monument
6.23 km
Highlight • Parking
Tip by
10.2 km
Highlight • Bridge
Tip by
12.4 km
Highlight • Natural
19.7 km
Highlight • Rest Area
Tip by
25.7 km
End point
Train Station
Way Types & Surfaces
Way Types
24.1 km
1.31 km
113 m
102 m
< 100 m
< 100 m
< 100 m
Surfaces
12.9 km
12.5 km
235 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Saturday 10 October
14°C
6°C
0 %
Additional weather tips
Max wind speed: 11.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.