Mount Henry Bridge – Canning Bridge loop from Cockburn Central
Mount Henry Bridge – Canning Bridge loop from Cockburn Central
7
riders
02:17
38.0km
150m
Cycling
Moderate bike ride. Good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: May 27, 2026
Tips
Includes a segment in which cycling is not permitted
After 21.8 km for 128 m
Waypoints
Start point
Train Station
Get Directions
11.5 km
Highlight • Cafe
Tip by
11.7 km
Highlight • Bridge
Tip by
12.3 km
Beach
Beach
12.5 km
Highlight (Segment) • Cycleway
Tip by
13.9 km
Canning River
Lake
15.1 km
Highlight • Bridge
Tip by
15.5 km
Highlight • Monument
Tip by
16.3 km
Highlight (Segment) • Cycleway
Translated by Google •
Tip by
38.0 km
End point
Train Station
Way Types & Surfaces
Way Types
32.8 km
2.47 km
1.27 km
1.08 km
216 m
215 m
< 100 m
Surfaces
24.1 km
12.5 km
1.02 km
415 m
< 100 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Wednesday 8 July
21°C
7°C
32 %
Additional weather tips
Max wind speed: 11.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free