Stone Canal Lock and Bridge – Workhouse Bridge loop from Stone
Stone Canal Lock and Bridge – Workhouse Bridge loop from Stone
48
runners
01:38
15.5km
50m
Running
Hard run. Very good fitness required. Mostly paved surfaces. The starting point of the route is accessible with public transport.
Last updated: September 24, 2026
Tips
Temporary access restrictions
Includes segments with temporary access restrictions. Check ahead to confirm restricted segments are open to the public.
After 14.2 km for 86 m
Waypoints
Start point
Train Station
920 m
Highlight • Structure
Tip by
1.70 km
Highlight • Bridge
Tip by
9.53 km
Highlight • Historical Site
Tip by
9.58 km
Highlight • Bridge
Tip by
9.81 km
Highlight • Cycleway
Tip by
9.94 km
Highlight • River
10.6 km
Highlight • Viewpoint
Tip by
14.8 km
Highlight • Other
Tip by
15.5 km
End point
Train Station
Way Types & Surfaces
Way Types
5.94 km
3.46 km
2.12 km
2.07 km
1.24 km
636 m
108 m
Surfaces
6.30 km
3.48 km
2.51 km
1.27 km
1.26 km
394 m
Sign up to see more specific route details
Sign up for freeElevation
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Tuesday 17 November
11°C
2°C
98 %
Additional weather tips
It’s set to rain on your activity. Pack a waterproof jacket.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.