Monsal Trail Stone Arch Bridge – Headstone Tunnel loop from Buxton
Monsal Trail Stone Arch Bridge – Headstone Tunnel loop from Buxton
4.0
(1)
17
riders
03:25
56.0km
810m
Gravel riding
Hard gravel ride. Very good fitness required. Mostly paved surfaces. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: April 3, 2026
Tips
Cycling is not permitted along parts of this route
After 2.26 km for 248 m
After 54.7 km for 100 m
Waypoints
Start point
Train Station
Get Directions
2.44 km
Sherbrook Wood
Forest
23.4 km
Rake Wood
Forest
32.8 km
Highlight • Cycleway
Tip by
33.3 km
Highlight • Trail
Tip by
36.6 km
Highlight • Trail
Tip by
37.5 km
Highlight • Structure
Tip by
38.1 km
Highlight • Viewpoint
Tip by
38.9 km
Highlight (Segment) • Trail
Tip by
39.5 km
Highlight • Structure
Tip by
40.1 km
Highlight • Trail
Tip by
56.0 km
End point
Train Station
Way Types & Surfaces
Way Types
32.7 km
15.5 km
3.29 km
2.73 km
1.42 km
309 m
188 m
Surfaces
30.3 km
13.6 km
8.81 km
3.00 km
332 m
Sign up to see more specific route details
Sign up for free
Elevation
Highest point (430 m)
Lowest point (120 m)
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Sunday 10 May
10°C
4°C
53 %
Additional weather tips
Max wind speed: 19.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.