Wilbur Dam – Elizabethton Covered Bridge loop from Milligan University
Wilbur Dam – Elizabethton Covered Bridge loop from Milligan University
3.1
(12)
68
riders
02:47
55.0km
480m
Road cycling
Moderate road ride. Good fitness required. Some segments of this route may be unpaved and difficult to ride. The starting point of the route is right next to a parking lot.
Last updated: September 9, 2026
Tips
Includes a segment in which cycling is not permitted
After 43.3 km for 62 m
Waypoints
Start point
Parking
17.6 km
Highlight • Historical Site
Tip by
29.6 km
Highlight • Monument
Tip by
31.7 km
Wilbur Lake
Lake
43.4 km
Highlight • Bridge
Tip by
47.6 km
Highlight • Historical Site
Tip by
50.6 km
Highlight (Segment) • Trail
Tip by
55.0 km
End point
Parking
Way Types & Surfaces
Way Types
26.7 km
25.2 km
1.70 km
1.06 km
386 m
Surfaces
29.5 km
23.6 km
1.63 km
287 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (550 m)
Lowest point (440 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Tuesday 13 October
27°C
13°C
0 %
Additional weather tips
Max wind speed: 12.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.