Queen's Arms – Bridge Over Dried Riverbed loop from Litton
Queen's Arms – Bridge Over Dried Riverbed loop from Litton
4.5
(2)
26
hikers
03:29
12.5km
230m
Hiking
Moderate hike. Good fitness required. Easily walkable paths.
Last updated: November 3, 2026
Tips
Your route passes through a protected area
Please check local regulations for:
Waypoints
Start point
125 m
Highlight • Restaurant
Tip by
757 m
Highlight • Natural Monument
Tip by
8.52 km
Highlight • Trail
Tip by
9.76 km
Highlight (Segment) • Trail
Tip by
11.5 km
Highlight • River
Tip by
12.5 km
End point
Way Types & Surfaces
Way Types
11.2 km
808 m
303 m
155 m
< 100 m
Surfaces
5.69 km
4.57 km
714 m
613 m
607 m
206 m
Sign up to see more specific route details
Sign up for freeElevation
Highest point (420 m)
Lowest point (250 m)
Sign up to see more specific route details
Sign up for freeWeather
Powered by Foreca
Today
Friday 27 November
2°C
-1°C
91 %
Additional weather tips
It’s set to rain on your activity. Pack a waterproof jacket.
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.