Workhouse Bridge – Stone Canal Lock and Bridge loop from Stone
Workhouse Bridge – Stone Canal Lock and Bridge loop from Stone
4.5
(2)
26
hikers
01:35
6.12km
30m
Hiking
Easy hike. Great for any fitness level. Easily-accessible paths. Suitable for all skill levels. The starting point of the route is accessible with public transport.
Last updated: June 19, 2026
Tips
Temporary access restrictions
Includes segments with temporary access restrictions. Check ahead to confirm restricted segments are open to the public.
After 1.35 km for 266 m
Waypoints
Start point
Bus stop
Get Directions
701 m
Highlight • Bridge
Tip by
751 m
Highlight • Historical Site
Tip by
870 m
Highlight • Historical Site
Tip by
1.03 km
Highlight • Cycleway
Tip by
3.47 km
Highlight • Bridge
Tip by
4.25 km
Highlight • Structure
Tip by
5.02 km
Highlight • Bridge
Tip by
5.15 km
Highlight • Structure
Tip by
6.12 km
End point
Bus stop
Way Types & Surfaces
Way Types
1.99 km
1.89 km
1.57 km
409 m
114 m
111 m
Surfaces
3.05 km
1.59 km
899 m
338 m
207 m
Sign up to see more specific route details
Sign up for free
Elevation
Sign up to see more specific route details
Sign up for free
Weather
Powered by Foreca
Thursday 9 July
33°C
15°C
0 %
Additional weather tips
Max wind speed: 13.0 km/h
to get more detailed weather forecasts along your route
Our route recommendations are based on thousands of hikes, rides, and runs completed by other people on komoot.
Comments
Want to know more?
Sign up for a free komoot account to join the conversation.
Sign up for free