Hydroelectric Power Plant in Upper Lusatia
Hydroelectric Power Plant in Upper Lusatia
Tips

In the know? Log-in to add a tip for other adventurers!
Nearby routes
Best routes near Hydroelectric Power Plant in Upper Lusatia

3.0
(1)
4
riders
33.3km
02:27
170m
170m
Moderate bike ride. Good fitness required. Mostly paved surfaces.

2
riders
21.1km
01:25
120m
120m
Easy bike ride. Mostly paved surfaces.
Details
Informations
Elevation 170 m
Weather
Powered by Foreca
Friday 30 October
11°C
6°C
51 %
Additional weather tips
There’s a fairly high chance of rain. Consider packing a waterproof jacket.
Most visited during
January
February
March
April
May
June
July
August
September
October
November
December
Location: Osiecznica, powiat bolesławiecki, Lower Silesian Voivodeship, Poland