Ruś Hydroelectric Power Plant
Ruś Hydroelectric Power Plant
Tips

In the know? Log-in to add a tip for other adventurers!
Nearby routes
Best routes near Ruś Hydroelectric Power Plant

4.8
(15)
77
hikers
7.03km
01:51
60m
60m
Easy hike. Easily walkable paths.

5.0
(6)
45
hikers
9.68km
02:33
80m
80m
Moderate hike. Good fitness required. Easily walkable paths.

5.0
(4)
13
hikers
13.1km
03:28
120m
120m
Moderate hike. Good fitness required. Easily walkable paths.
Details
Informations
Elevation 120 m
Weather
Powered by Foreca
Friday 30 October
10°C
3°C
34 %
Additional weather tips
There’s a fairly high chance of rain. Consider packing a waterproof jacket.
Most visited during
January
February
March
April
May
June
July
August
September
October
November
December
Location: Stawiguda, powiat olsztyński, Warmian-Masurian Voivodeship, Poland